Columbia
Vorige project Volgende project

Profile: ZK 785
Thickness: 6 mm
Steel quality: S 275 JR
Length: 7,000 mm
Quantity: 1,300 tons
Remarks:

A 3.5 km long wall of sheet piles was necessary to lead the contaminated water from the city of Cartagena in Columbia was necessary to garanty a stabil quality of the water. A quite simple solution to loose the dirty water during low tide and refresh water during high tide.