The height of the ceiling makes the work with the necessary length
of sheet piles very difficult. The mast of a forklift was mounted
on a small excavator and the vibrator was attached here to. Also
the piles had to be welded each 4.000mm and doing so the limited
space is no problem in finalising the work.
|